 |
|
| |
|
 |
 |
at Global Oneness Community.
Share your dreams and let others help you with the interpretation!
Dream Sharing Forum
|
 |
BR standard class 5 - Design and construction |  | BR standard class 5 - Design and construction: Encyclopedia II - BR standard class 5 - Design and construction |  | The design work was done at ex-LNER works at Doncaster but the bulk of the construction was done at Derby. The locomotive featured a Type 3B boiler almost identical to the black fives'. A higher running plate and slightly enlarged driving wheels from 6' to 6'2" and a standard cab were the most obvious visible changes.
The first of the class, 73100 was outshopped from Derby in April 1951 and 30 were in service by January 1952. There was then a gap in construction before Derby resumed building its remaining 100 engines. 42 were built at Doncaster, starting in August 1955 and finishin ...
See also:BR standard class 5, BR standard class 5 - Background, BR standard class 5 - Design and construction, BR standard class 5 - In service, BR standard class 5 - Preservation, BR standard class 5 - Referencs |  | | BR standard class 5, BR standard class 5 - Background, BR standard class 5 - Design and construction, BR standard class 5 - In service, BR standard class 5 - Preservation, BR standard class 5 - Referencs |  | |
|  |  | BR standard class 5: Encyclopedia II - BR standard class 5 - Design and construction
BR standard class 5 - Design and construction
The design work was done at ex-LNER works at Doncaster but the bulk of the construction was done at Derby. The locomotive featured a Type 3B boiler almost identical to the black fives'. A higher running plate and slightly enlarged driving wheels from 6' to 6'2" and a standard cab were the most obvious visible changes.
The first of the class, 73100 was outshopped from Derby in April 1951 and 30 were in service by January 1952. There was then a gap in construction before Derby resumed building its remaining 100 engines. 42 were built at Doncaster, starting in August 1955 and finishing in May 1957 with Derby's last engine following a month later.
30 engines, numbers 73125 to 73154 were built with Caprotti valve gear.
Other related archives1934, 1950s, 1951, 1955, 4-6-0, August, British Railways, Camelot, Caprotti valve gear, Derby, Doncaster, Elaine, Excalibur, Iseuit, King Leodegrance, King Pellinore, King Uther, LMS black five, Lyonnesse, Maid of Astolat, Merlin, Morgan Le Fay, Pendragon, The Green Knight, The Red Knight, Tintagel, Vivien, William Stanier, black five, boiler, standard classes
 Adapted from the Wikipedia article "Design and construction", under the G.N U Free Docmentation License. Please also see http://en.wikipedia.org/wiki |
|
|
More material related to Br Standard Class 5 can be found here:
|
|
« Back
|
Search the Global Oneness web site |
|
|
|
|
 |
Sneak-Peek of Global Oneness Community
Hi friend! The Global Oneness Community, the place for information and sharing about Oneness is not really launched yet (you will see there is still some clean up to do) ...but it is now open for a sneak-peek! And if you wish - please register and become one of the very first members to do so! Jonas
Forum Home,
Articles,
Photo Gallery,
Videos,
News,
Sitemap
...and much more!
|